The facility is located in the position (approx) : Lat. 22°43.8’ N, 69°42.3’ E
MPT |
Depth (mtrs) |
LOA (mtrs) |
Beam (mtrs) |
Draft *(mtrs) |
Deadweight |
Displacement |
Max. Operating Area |
Berth
N0:1 |
16.5 |
275 |
38 |
15.0 |
75000 |
90000 |
171.5 mtrs for Bulk(shore cranes),178 mtrs for Bulk (shore cranes+Excavators - charges extra as per port tarriff ) 124 mtrs for Break bulk(ship s cranes). |
Berth
N0:2 |
16.0 |
180 |
32 |
13.0 |
30000 |
40000 |
as per manifold connection |
Berth
N0:3 |
14.6 |
225 |
38 |
14.5 |
60000 |
90000 |
151.5 mtrs for Bulk(shore cranes),158 mtrs for Bulk(shore cranes + excavator - charges extra as per tarriff ),151.5 mtrs for break bulk(ship s cranes) |
Berth
N0:4 |
13.0 |
225 |
32 |
13.1 |
60000 |
90000 |
145 mtrs for Bulk(shore cranes),151.5 mtrs for Bulk(shore cranes +excavator - charges extra as per Port Tarriff ),151.5 mtrs for break bulk(ship s cranes) |
Barge
Berth |
9 |
80 |
15 |
6 |
2500 |
4200 |
|
Terminal 2 |
Berth
N0:5 |
14.4 |
250 |
38 |
14.1 |
150000 |
180000 |
549 mtrs (shore cranes),536 mtrs (ships cranes) |
Berth
N0:6 |
15.6 |
250
(See Note) |
38 |
15.5 |
150000 |
180000 |
Berth
N0:7 |
12.5 |
175 |
35 |
12.0 |
40000 |
63000 |
397 mtrs(shore cranes),390 mtrs (ship’s cranes) |
Berth
N0:8 |
12.5 |
175
(See Note) |
35 |
10.5 |
40000 |
63000 |
Terminal 3 |
Berth
N0:9 |
|
|
|
13.0 |
|
74000 |
|
Berth
N0:10 |
|
|
|
13.5 |
|
74000 |
|
Note: |
1. A Minimum under keel clearance of "10% the ship s draft" will be maintained at the time of berthing.
2. Total Quay length of Berth no 5 & 6 is 575 mtrs, Berth 7 & 8 is 442 mtrs each in a straight line and hence more than two ships
can be berthed in each quay depending on LOA subject to a minimum of 40 mtrs clearance between each vessel.
3. Dumping of Cargo on Jetty is not allowed.
4. Depth given are below chart Datum.
5. * Actual berthing draft may be higher basis tide . |
|